Fox ESS · 3-phase EMS box · export limitation
Fox ESS AI Link EMS box for 3PH systems
The AI Link is Fox ESS's EMS box for contractors running three-phase Fox systems, handling energy management and export limitation at system level. It suits firms that want the control side of every 3PH design settled by the same box.
Delivery in 3–5 working days (estimate). The dispatch clock starts at cleared payment.
Description
On three-phase work the export limit is a system-level problem, and the AI Link is the Fox box that deals with it. For firms standardising on Fox 3PH equipment, carrying one EMS part number across every design keeps surveys, quotes and commissioning consistent, instead of a different control scheme per job. One box also gives the office one line to quote and the stores one part to pick, across the Fox 3PH designs it serves. Pricing follows the house rule: the ex-VAT figure is public on the page, and no account tiers sit behind it.
Specification
| Brand | Fox ESS |
|---|---|
| Part number | FE-AI-LINK |
| Phase | Three-phase |
| Condition | New |
| Category | Parts & accessories · Export Limitation 3ph |
| Delivery method | Parcel courier |
What it pairs with
It belongs beside the Fox three-phase inverters: the H3 hybrids and the T Series PV units. Add the Fox 3PH Meter (CHINT DTSU666) from the same export-limitation family where the design calls for site metering. Exactly which inverter models and firmware revisions the AI Link supports depends on the current release, so confirm the combination against Fox ESS's pairing list; Fox also lists a separate H3 Pro EMS for paralleling H3 Pro inverters.
For three-phase Fox systems only. It is a control box, so it contributes no generation or storage capacity itself. For anything this page can't settle, ask the trade desk before ordering or consult a competent installer.
Often bought alongside
Last updated 2026-07-19