GivEnergy · AIO 2 gateway · GivEnergy accessory
GivEnergy AIO 2 gateway accessory
Fitting a second-generation GivEnergy All-in-One means fitting its gateway, and this is that unit sold on its own. The AIO 2 gateway sits between the All-in-One and the incoming supply, carrying the metering and grid interface the Gen 2 system relies on to measure and control.
Delivery in 3–5 working days (estimate). The dispatch clock starts at cleared payment.
Description
Keep one to hand for a gateway lost in transit, a unit knocked on site, or a Gen 2 install you want to bring in ready. Because it is built for the second-generation All-in-One, it does not stand in for the AIO 1 gateway and the two generations should not be crossed. The purchase is straightforward trade: the ex-VAT price shown on this page is what your account is charged, from UK stock, and that rate is the same for one unit or a batch.
Specification
| Brand | GivEnergy |
|---|---|
| Part number | GIV-AIO2-GATEWAY |
| Phase | Single-phase |
| Condition | New |
| Category | Parts & accessories · Accessory |
| Delivery method | Parcel courier |
Datasheets & manuals
What it pairs with
As part of the GivEnergy AIO 2 platform, it goes with the AIO 2 12 kW 13.5 kWh (GIV-AIO2-12KW-13.5KWH) and the AIO 2 expansion battery (GIV-AIO2-EXP-13.5KWH). It does not replace the AIO 1 gateway (GIV-AIO1-GATEWAY). Confirm the gateway against the specific AIO 2 revision and firmware on GivEnergy's current pairing list before ordering in numbers.
Single-phase, and tied to the AIO 2 generation only. It is a grid-interface accessory with no storage capacity itself. For anything this page can't settle, ask the trade desk before ordering or consult a competent installer.
Often bought alongside
Last updated 2026-07-19